RMR Relevant Project Sheets 1993 - 2009
|
Detailed Tasks Assigned |
Yrs. |
Country |
Project Name |
Duties and time on Project |
| GHG Inventory and Reduction/ Mitigation Plan | 2008-Present | Kazakhstan | Caspian Services Inc. | Scoping of data quality and selection of base year and accounting standards. GHG inventory prepared for 3 financial years 2006 to 2008. Formulation of GHG management policy. Identification of most feasible GHG mitigation and reduction programs. 6 man months |
|
Establishment and verification of novel food/crop traceability
systems in PRC applicable to low cost country suppliers. |
2004-Present |
PRC |
Food Systems International |
Sustainability assessment and established in cooperation with small growers and large
processing companies novel low cost traceability systems to
improve the safety and quality of tomatoes (Xinjiang), beans (Helionjiang)
and rice (Anhui) being grown for local and export markets.
63 man months |
| Wind power feasibility study for the Atash Marine Base | 2008 | Kazakhstan | Caspian Services Inc. | Resource assessment, turbine selection and optimisation. Economic modeling of project alternatives. Social and environment impact assessment. Assessment of institutional barriers and potential fatal flaws. 4 man months |
|
Establishing ground control points for
Aerial Photography in Somalia |
2007-Present |
Somalia |
FAO SWALIM |
Ground support for aerial photography of Jubba and Shabelle rivers in southern Somalia. Ground survey of photo control points for high accuracy photogrammetric mapping of rivers and floodplains. |
|
Photomapping of agricultural area for urban development using a
Tethered Balloon Imaging System (TEBIS) |
2008 |
Lao PDR |
National Land Management Authority |
Aerial photomapping of
3000ha of agricultural land, use and advice on evaluation,
compensation and planning program at That Luang Marsh Area,
Vientiane, Lao PDR. 2 man months |
|
Renewable energy resource and environmental assessments (micro hydro, solar, wind, biofuels) |
2005 -Present |
Lao PDR |
Sunlabob (Private Renewable Energy Company) |
Renewable energy resource assessments for project sites and
scientific technical assistance provided for a renewable energy
supply company. 7 man months to date |
|
Pilot Project to demonstrate a Tethered Balloon Imaging System
(TEBIS) for Cadastral Mapping in Lao PDR |
2007 |
Lao PDR |
National Land Management Authority |
Demonstrated a methodology for accurately and quickly marking
adjudicated land parcels onto fully rectified and geo-referenced
high resolution digital images captured using a TEBIS for 7
villages covering a total of 3,600ha. 16 man months |
|
Small community (200 homes) renewable energy resource assessment |
2007 |
UK |
Forest Green Village Association, Surrey |
Identified most economic balance of renewable energy options for
a small community (wind, biofuels, heat pumps, solar, microhydro).
1 man month |
|
Prepare an EIA for the
expansion of an existing project. Due-diligence of
existing social and environmental impacts and mitigation
projects.
|
2004-2006 |
Lao PDR |
Theun-Hinboun Power
Project |
Fieldwork and desk studies
to prepare an EIA and Social Action Plan and Resettlement Action
Plan and Environmental Management Plan.
Assessed and prepared hydrological models for different project
alternatives.
Prepared project carbon cycle analysis. Assessed and advised on renewable energy resources for
resettlement sites. 107 man months. |
|
Prepared a
“Manual for Managing the EIA Process
for
Fisheries and Aquatic Environments in Lao PDR by
National Agencies”. |
2004 |
Lao PDR |
Mekong River Commission (MRC) |
Manual designed to allow National Government agency staff to
analyse Project documents in a systematic manner to ensure that
all fishery and aquatic environment stakeholders in the
development process are considered and projects with planning
deficiencies identified at an early stage.
Presented a 2 day workshop.
3 man
months |
|
Prepare pre-feasibility
social and environmental assessments of candidate power projects
to assess real economic costs and benefits for the Power Sector
Development Plan. |
2004 |
Lao PDR |
Power Sector Development
Plan |
Collection and analysis of
of pre-feasibility information. Assessed and prepared
hydrological models for different project alternatives.
Preparation of a computer model (SESAMEE) to estimate real
social and environmental costs of each project over 30 years.
Prepared carbon cycle
analysis for novel carbon credit application (prior to CDM). 1 man month. |
|
Hydrological review of catchment, prepare and implement action plan to
improve hydrological record |
2001 - 2003 |
Lao PDR |
Theun-Hinboun Power
Project |
Reviewed hydrological data
to assess changes caused by a new upstream diversion project.
Designed, installed, operated and rated automatic 3 auditing
standard remote river gauging stations sites.
Prepared a sediment transport model, and carried out a sediment
sampling programme. 6 man-months.
|
|
Regional (Lao, Thai, Vietnam and Cambodia) Teaching Workshop on
the EIA process |
2003 |
Lao PDR |
Mekong River Commission (MRC) |
Prepared teaching and demonstration materials for a 5 day regional
workshop on EIA for regional MRC staff.
Constructed hydrological models for a “hands on”
examination of the underlying physical processes.
Examined affects of impoundments and barriers on the
fishery. Brought together regulators (STEA, and line agency
environmental departments),
agencies affecting the river (mining, hydropower, and
irrigation schemes) and donors (SIDA, World Bank, WWF). 2 man
months |
|
Environmental advisors for
all aspects of the implementation by EDL & WE of the EMP, SAP
and RAP for the Nam Mang 3 hydropower project. |
2002-2005 |
Lao PDR |
Nam Mang 3 Hydropower
Project |
Desk and Field work to
monitor effectiveness of the compensation and mitigation works
outlined in EMP, SAP and RAP. Recommend corrective
measures where necessary. 45 man months. |
|
Review Project Technical
Proposal and prepare an EMP, SAP and RAP for the Nam Mang 3
Hydropower Project |
2002 |
Lao PDR |
Nam Mang 3 Hydropower
Project |
Review 1993 EIA and new
Project Technical Proposal. Evaluate using a Nam Leuk
“Impact Model” and prepare a EMP, SAP and EMP. 12 man
months. |
|
Investigate a selection of weirs and other water barriers in Mekong
tributaries in Thailand and Lao, and prepare a proposal for
designing low cost generic fish passes for low weirs, and
alternative solutions for high weirs. |
2001-2002 |
Thailand & Lao PDR |
Fish Pass Study |
Reconnaissance investigation of important weirs including Pak Mun,
Theun Hinboun, Nam Song, and many small weirs in the Nam Mun
basin. Design trials. 0.5 man month. |
|
Investigate the impacts of
the Nam Song Diversion on affected people, and devise an
appropriate programme of mitigations and compensation. |
2001 |
Lao PDR |
Nam Song Diversion Project |
Investigate the Nam Song
Diversion impact event, and assess the social and environmental
consequences. Liaise with EdL and villages to devise
acceptable procedures to rectify any problems. 3 man months. |
|
Review existing IEE,
over-fly site, review all social, political and environmental
implications and prepare a strategic analysis as a basis for
commissioning EIA work. |
2000 |
Myanmar |
Ta Sang Hydropower Project |
Develop a methodology,
carry out field work, deploy light aircraft for survey, analyse
data and write a Strategic Social and Environmental Impact
Analysis Report. 5 man-months. |
|
Review of existing
environmental impact assessments, prepare and carry out an
investigative programme to improve as necessary, rectify
deficiencies and generate social action plans,
environmental management plans, resettlement plans and minority
peoples development plan for the proposed hydropower project.
Devise compliance monitoring procedures. |
2000 |
Vietnam |
Se San 3 Hydropower
Project |
Field work and desk
studies to determine whether the SS3 Project had
negligible social and environmental impacts, and was therefore a
sound investment. 4 man-months. |
|
Review existing situation
in which there are numerous problems of unmitigated social and
environmental impacts, review operations of THPC’s present
Environment Management Committee & devise a 10 year plan to
rectify.
|
2000 |
Lao PDR |
Theun-Hinboun Power
Project |
Field work and desk
studies to prepare a 10 yr. Mitigation and Compensation Master
Plan. 2 man-month.
|
|
Collect information from
field work on environment, wild-life, land-use, vegetation and
analyse trends, using aerial photographs and other sources, |
1999 |
Lao PDR |
Nam Ngiep
Hydropower Project |
Develop a methodology,
carry out field work to assess environmental values, analyse
data and write reports on land-use, vegetation & wildlife
affected by the Nam Ngiep Reservoir. 5 man-months. |
|
Study the present water
quality situation in Nam Ngum 1 Reservoir to construct, with any
valid historical records, a picture of the evolution of water
quality from first inundation to the present time. |
1998-2000 |
Lao PDR |
Nam Ngum 1 Reservoir Study |
Develop a methodology,
deploy boats and water quality profile sampling equipment over
the reservoir at critical times, and develop a model of present
year-round water quality variations. |
|
Review of existing
environmental impact assessments, prepare and carry out an
investigative programme to rectify deficiencies and generate
social action plans and environmental management plans for
proposed hydropower projects. Devise compliance monitoring
procedures, and provide a 30 year planning budget. |
1998-2001 |
Lao PDR |
Nam Ngum 3 Hydropower
Project |
Develop a methodology,
carry out field work, manage a multi-disciplinary team, deploy
light aircraft for survey, analyse data and write an Impact
Analysis, Social Action Plan and Environmental Management Plan
to the stage of meeting ADB lending standards.
Prepared carbon cycle analysis for novel carbon credit
application (prior to CDM).
68 man-months over 3.5
years. |
|
Research into recognition
and temperatures of S.E.Asian forest burning. |
1998-1999 |
Lao PDR |
Satellite Signature
Calibration for Fires Project
|
Develop a methodology,
carry out field work, conduct standardised and carefully
monitored vegetation burns with thermocouple arrays, send
digitised data to Global Vegetation Monitoring Unit, Space
Applications Institute.
Joint Research Centre of
the European Commission for generating fire recognition
and temperature calibration algorithms. 4 man-months over
2 years. |
|
Determine the rates of
decomposition of biomass material flooded by reservoirs in
conditions typical of Lao PDR.
|
1997-1999 |
Lao PDR |
Organic Matter
Decomposition Studies |
Develop methodology, set
up decomposition trials to simulate a range of expected
conditions , monitor very 6 months. 2.5 man months over 3 years. |
|
Design and execution of
sampling studies to generate household production system
profiles for assessment of the consequences of changed flooding
patterns. |
1997 |
Lao PDR |
NT2 Hydropower Project |
Field work to study
potential impacts of flooding in the upper Xe Bangfai
2 man-months. |
|
Develop an appropriate
model-based methodology to compare social and environmental
impact costs and benefits of alternative hydropower projects,
and test on NT2 alternatives. |
1997 |
Lao PDR |
NT2 Study of Alternatives |
Desk studies to develop
models of social and environmental impacts to be expected
for Hydropower Projects in Lao based on precedent cases and real
costs. Prepared and manipulated hydrological models.
4 man- months. |
|
Review EIA, write an SAP
and modify EMP, execute numerous mitigation measures, monitor
impact events and consequences, and prepare reports
including completion reports for ADB, |
1996-2001 |
Lao PDR |
Nam Leuk Hydropower
Project |
Develop methodologies,
carry out field work and surveys, manage a multi-disciplinary
team, execute mitigation measures including resettlement, train
local personnel, analyse data and write reports. 48
man-months over 6 years. |
|
Carry out long-term
monitoring of the expected natural decline in the fresh-water
fishery of Thailand’s Nam Mun Basin, to devise alternative
protein production strategies with commercial implications. |
1996-2002 |
Thailand |
Nam Mun Basin Fishery
Monitoring |
Develop a methodology, set
up monitoring systems and maintain records. Analyse trends
and report any developments of potential interest to FSI & their
clients. 18 man-months over 6 years so far. |
|
Generation of
environmental impact analyses, social action plans and
environmental management plans for proposed hydropower projects. |
1994-1997 |
Lao PDR |
Xe Kaman 1 Hydropower
Project |
Develop a methodology,
carry out field work, function as a multi-disciplinary team,
deploy light aircraft for survey, analyse data and write Initial
Environmental Impact Analyses Reports. 60 man-months over
3.5 years. |
|
Assess the volumes and
classes timber for each species of commercial timber tree in
Vientiane, Saynabouli and Xieng Khouang Provinces using an
aerial photogrammetric method. |
1994-1997 |
Lao PDR |
HIPA Forest Inventory
Project |
Develop a methodology,
deploy light aircraft and small format sampling cameras, analyse
canopy for tree species and stem diameters by application of
results of calibration plots. Create species identification
keys. Perform inventory surveys over SFE 6/9 and Xieng
Khouang Province. 56 man-months over 3 years. |
|
Assess numbers and
distribution of flamingo on Lake Natron. Report on the
likely affects of a diversion of water into Lake Natron, an
internal drainage basin subject to extreme inter-annual
variations in level. |
1993 |
Kenya |
Ewaso Ngiro Hydropower
Project |
Develop a methodology,
carry out field work, deploy light aircraft for surveys, field
work on the ground, analysis of data and report writing to
estimate the numbers of flamingo on Lake Natron, and to assess
the likely impact of changes in lake levels following a
diversion of water into the Ewaso Ngiro Basin. 2
man-months. |